http://dev-ms.markus-heinsdorff.de/sites/default/files/home/website/Installationen/bewegung/arbeitszeit/01.jpg

 

http://dev-ms.markus-heinsdorff.de/sites/default/files/home/website/Installationen/bewegung/arbeitszeit/02.jpg Arbeitszeit

1994 KHD Building, Cologne Germany

Three groups of figures are permanently moving in a hall of 70 m length in the high rise of the Klöckner-Humboldt-Deutz company. Installed are: two rubber bellows in converse movements up and down. A yellow-white arbor, racked 10 m, folded together 2 x 2 m, making a U-turn when folded and is unfolded afterwards. Ten wings in different height underneath the ceiling with gimballed bedding are put into motion when somebody is walking through the hall.

03.jpg

04.jpg 05.jpg
06.jpg
07.jpg
08.jpg